  Our Presence - Domestic  
 
Sl No.  Client  Job Description  Rounded off in Rs Cr. Rounded off in US $ in millions Start  Completed  State 
PROJECTS EXECUTED
1 Neyveli Lignite Corpn. Ltd, Neyvel Civil works related to Roads & Drains (CO4-Package) of 2x21 OMW FirstThermal Power Station Expansion Project
3.34
0.7
Jun-00 2003 Tamil Nadu 
2 Tata Electric Cos., Mumbai Design, manufacture, supply of equipment, performance test for 1 x 25 MW Thermal Power Plant,1 x 110 TPH BFBC Steam Generator with all its Auxiliaries and Complete Raw Water System Equipment and Piping including all the Civil and Enabling Works, Wadi
153
34.1
Aug-00 2002 Maharashtra 
3 Bharat Heavy Electricals Ltd., Chennai Handling at site stores/storage yard, transportation to site of work, erection, testing and commissioning of structures, pressure parts, non pressure parts, air pre heaters, ducts and supply and application of final painting of Boiler for Unit -IV of 4 x 500 MW Units at Talcher Super Thermal Power Project Stage II for NTPC Talcher, Orissa State
13
2.8
Nov-00 2001 Orissa 
4 Bharat Heavy Electricals Ltd., Chennai Simhadri Thermal Power Project -Handling at Site Store/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Power Cycle Piping andSGAux.PipingforUnit2of2x500MW Sets at NTPC Simhadri TPP, Vizag, AP
3
0.7
Jul-01 2002 Andhra Pradesh 
5 Alstom Power India Ltd., Baroda Unloading at site, storage, material handling at site, security, erection, testing and commissioning assistance for complete mechanical and electrical worksof4 x 500 MWESP package at Talcher Super Thermal Power Station
11
2.3
Feb-01 2002 Orissa 
6 Bharat Heavy Electricals Ltd., Chennai Handling at Site Stores/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Structures, Pressure Parts, Non -Pressure Parts, Air Pre-heaters, Ducts & Supply and Application of Final Painting of Boiler for Unit VI of 4 x 500 MW Sets at Talcher Super Thermal Power Project Stage II for NTPC, Angul Dist, Orissa State
12
2.6
Feb-01 2003 Orissa 
7 BHEL, Noida EPC of BOP for 2 x 210 MW Coal Based Power Plant as Extension Units 3 & 4 at Parichha, UP
539
119.7
Oct-02 2008 Uttar Pradesh 
8 BHEL, Nagpur Unloading & Positioning of Boiler Drum, collection of materials from BHEL / Client’s stores / storage yard, transportation to site, erection, testing and commissioning, trial operation and handing over of Boiler and its Auxiliaries - Rotating machines including mills, ducts and fuel piping etc. of 1 x 500 MW Unit#3 at Rihand Thermal Power Station, Rihand, Dist. Sonbhadra, UP State
12
2.6
Sep-02 2005 Uttar Pradesh 
9 BHEL, Nagpur Supply & Erection of BoP equipment for 2 x 77 MW CPP for Hindustan Zinc Ltd., Chanderia, Chittorgarh Dist., Rajasthan
200
44.4
May-03 2005 Rajasthan 
10 BHEL, Nagpur Transportation & positioning of boiler drum, collection of materials from BHEL / Clients’ stores / storage yard, transportation to site, erection, testing & commissioning, trial operation and handing over of boiler and its auxiliaries, rotating machines including mills, ducts & fuel piping etc. of 500 MW Unit # 9 Stage-Ill at Vindhyachal STPP, Madhya Pradesh
15
3.2
Jan-04 2008 Madhya Pradesh 
11 BHEL, Chennai Handling at site stores / storage yard, transportation to site office, erection, testing and commissioning of structures, pressure parts, non-pressure parts, air pre heaters, ducts and supply and application of final painting at Unit 1 of 2 x 500 MW sets at Sipat TPP, Bilaspur , Chattisgarh
13
2.8
Sep-04 2008 Chattisgarh 
12 Hindustan Zinc Limited, Udaypur EPC of BOP for 1x80 MW unit#3 CPP of HZL , Chenderiah, Rajasthan
98
21.9
Jan-06 2008 Rajasthan 
13 Dongfang Electric Corporation China Loading at site, erection & testing of equipment & material of main plant package for unit 1 of sagardighi (2 x 300 MW) Thermal Power Plant project, Murshidabad, West Bengal
47
11
Sep-05 2009 West Bengal 
14 HMCPCL Kolkota EPC of BOP for 2x45 MW Haldia Power Plant , West Bengal
105
23
Jan-06 2009 West Bengal 
15 Siemens, India Supply & erection of BOP piping for 1100 MW Sugen Project, Gujarat
77
17
Mar-06 2009 Gujarat 
16 Rajasthan Vidyut Utpadan Nigam Limited, Jaipur EPC of BOP for 1x125 MW Lignite Thermal Power Plant , Giral , Rajasthan
255
57
Mar-06 2009 Rajasthan  
17 Tata Power Company Limited BOP for 1 x 120 MW Power House # 6 power plant at Tata Steel , Jamshedpur.
105
23
Aug-06 2009 Jharkhand 
18 SEPCO, China Erection of 4 Boilers (Package 'B' - Units 4 to 7) at 9x 135 MW CPP for Vedanta Aluminum Plant Jharsuguda, Orissa
41
9
Nov-06 2010 Orissa 
19 RRVUNL EPC of BOP for 1 x 195 MW, Stage-V, Unit # 7, Kota Super Thermal Power Station, Rajasthan
270
60
Oct-06 2010 Rajasthan 
20 SEPCO, Jharsuguda Erection and installation of Electrical and Instrumentation & control system for 9 x 135 MW Captive Power Plant Project , Vedanta Aluminum Plant, Jharsuguda, Orissa
29
6
Jan-07 2010 Orissa 
21 HMCPCL BOP for 1x 30 MW unit3 Haldia Power Plant , West Bengal
51
11
May-07 2010 West Bengal 
 
Sl No.  Client  Job Description  Rounded off in Rs Cr. Rounded off in US $ in millions Start  Expected
Completion 
State 
PROJECTS UNDER EXECUTION
1 Hindustan Zinc Limited, Udaipur EPC of BOP for 1x80 MW coal based power Plant for HZL-IV , Zawar, Udaipur Dist, Rajasthan
150
33
Jan-07 2010 Rajasthan  
2 SEPCO III Power Construction Corporation Erection of 2 Nos. of Boilers (Package - 2) for 2X600 MW Thermal Power IPP Project at Jharsuguda, Orissa
74
16
Jul-07 2011 Orissa 
3 Coastal Gujarat Power Ltd. (fully owned subsidiary of Tata Power) Site establishment works on cost plus basis for the 4000 MW Supercritical Ultra Mega Power Project, Mundra, Gujarat
42
9
Oct-07 2010 Gujarat 
4 MAHAGENCO EPC of BOP for Bhusawal Thermal Power Station 2x500 MW Expansion project, Maharashtra
1900
422
Nov-07 2010 Maharashtra 
5 BHEL EPC of Balance of Plant Systems for 2x80 MW Coal Based Captive power Plant at Dariba, Rajasthan for M/s HZL
276
61
Apr-08 2010 Rajasthan  
6 BHEL EPC of Balance of Plant Systems for 2x80 MW Coal Based Captive power Plant at Dariba, Rajasthan for M/s HZL
276
61
Apr-08 2010 Rajasthan  
7 Andhra Pradesh Power Development Company Ltd (APPDCL) Engineering, procurement and construction of BOP systems and equipment package and essential spares for 2x800 MW TPP at Krishnapatnam, Nellore Dt.
2775
617
Feb-09 2012 Andhra Pradesh 
8 SIIL Tuticorin EPC of Balance of Plant Systems for 2x80 MW Coal Based Captive power Plant at Tuticorin.
300
67
Jan-10 2011 Tamil Nadu 