| Sl No. |
Client |
Job Description |
Rounded off in Rs Cr. |
Rounded off in US $ in millions |
Start |
Completed |
State |
PROJECTS EXECUTED |
| 1 |
Neyveli Lignite Corpn. Ltd, Neyvel |
Civil works related to Roads & Drains (CO4-Package) of 2x21 OMW FirstThermal Power Station Expansion Project |
3.34 |
0.7 |
Jun-00 |
2003 |
Tamil Nadu |
| 2 |
Tata Electric Cos., Mumbai |
Design, manufacture, supply of equipment, performance test for 1 x 25 MW Thermal Power Plant,1 x 110 TPH BFBC Steam Generator with all its Auxiliaries and Complete Raw Water System Equipment and Piping including all the Civil and Enabling Works, Wadi |
153 |
34.1 |
Aug-00 |
2002 |
Maharashtra |
| 3 |
Bharat Heavy Electricals Ltd., Chennai |
Handling at site stores/storage yard, transportation to site of work, erection, testing and commissioning of structures, pressure parts, non pressure parts, air pre heaters, ducts and supply and application of final painting of Boiler for Unit -IV of 4 x 500 MW Units at Talcher Super Thermal Power Project Stage II for NTPC Talcher, Orissa State |
13 |
2.8 |
Nov-00 |
2001 |
Orissa |
| 4 |
Bharat Heavy Electricals Ltd., Chennai |
Simhadri Thermal Power Project -Handling at Site Store/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Power Cycle Piping andSGAux.PipingforUnit2of2x500MW Sets at NTPC Simhadri TPP, Vizag, AP |
3 |
0.7 |
Jul-01 |
2002 |
Andhra Pradesh |
| 5 |
Alstom Power India Ltd., Baroda |
Unloading at site, storage, material handling at site, security, erection, testing and commissioning assistance for complete mechanical and electrical worksof4 x 500 MWESP package at Talcher Super Thermal Power Station |
11 |
2.3 |
Feb-01 |
2002 |
Orissa |
| 6 |
Bharat Heavy Electricals Ltd., Chennai |
Handling at Site Stores/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Structures, Pressure Parts, Non -Pressure Parts, Air Pre-heaters, Ducts & Supply and Application of Final Painting of Boiler for Unit VI of 4 x 500 MW Sets at Talcher Super Thermal Power Project Stage II for NTPC, Angul Dist, Orissa State |
12 |
2.6 |
Feb-01 |
2003 |
Orissa |
| 7 |
BHEL, Noida |
EPC of BOP for 2 x 210 MW Coal Based Power Plant as Extension Units 3 & 4 at Parichha, UP |
539 |
119.7 |
Oct-02 |
2008 |
Uttar Pradesh |
| 8 |
BHEL, Nagpur |
Unloading & Positioning of Boiler Drum, collection of materials from BHEL / Client’s stores / storage yard, transportation to site, erection, testing and commissioning, trial operation and handing over of Boiler and its Auxiliaries - Rotating machines including mills, ducts and fuel piping etc. of 1 x 500 MW Unit#3 at Rihand Thermal Power Station, Rihand, Dist. Sonbhadra, UP State |
12 |
2.6 |
Sep-02 |
2005 |
Uttar Pradesh |
| 9 |
BHEL, Nagpur |
Supply & Erection of BoP equipment for 2 x 77 MW CPP for Hindustan Zinc Ltd., Chanderia, Chittorgarh Dist., Rajasthan |
200 |
44.4 |
May-03 |
2005 |
Rajasthan |
| 10 |
BHEL, Nagpur |
Transportation & positioning of boiler drum, collection of materials from BHEL / Clients’ stores / storage yard, transportation to site, erection, testing & commissioning, trial operation and handing over of boiler and its auxiliaries, rotating machines including mills, ducts & fuel piping etc. of 500 MW Unit # 9 Stage-Ill at Vindhyachal STPP, Madhya Pradesh |
15 |
3.2 |
Jan-04 |
2008 |
Madhya Pradesh |
| 11 |
BHEL, Chennai |
Handling at site stores / storage yard, transportation to site office, erection, testing and commissioning of structures, pressure parts, non-pressure parts, air pre heaters, ducts and supply and application of final painting at Unit 1 of 2 x 500 MW sets at Sipat TPP, Bilaspur , Chattisgarh |
13 |
2.8 |
Sep-04 |
2008 |
Chattisgarh |
| 12 |
Hindustan Zinc Limited, Udaypur |
EPC of BOP for 1x80 MW unit#3 CPP of HZL , Chenderiah, Rajasthan |
98 |
21.9 |
Jan-06 |
2008 |
Rajasthan |
| 13 |
Dongfang Electric Corporation China |
Loading at site, erection & testing of equipment & material of main plant package for unit 1 of sagardighi (2 x 300 MW) Thermal Power Plant project, Murshidabad, West Bengal |
47 |
11 |
Sep-05 |
2009 |
West Bengal |
| 14 |
HMCPCL Kolkota |
EPC of BOP for 2x45 MW Haldia Power Plant , West Bengal |
105 |
23 |
Jan-06 |
2009 |
West Bengal |
| 15 |
Siemens, India |
Supply & erection of BOP piping for 1100 MW Sugen Project, Gujarat |
77 |
17 |
Mar-06 |
2009 |
Gujarat |
| 16 |
Rajasthan Vidyut Utpadan Nigam Limited, Jaipur |
EPC of BOP for 1x125 MW Lignite Thermal Power Plant , Giral , Rajasthan |
255 |
57 |
Mar-06 |
2009 |
Rajasthan |
| 17 |
Tata Power Company Limited |
BOP for 1 x 120 MW Power House # 6 power plant at Tata Steel , Jamshedpur. |
105 |
23 |
Aug-06 |
2009 |
Jharkhand |
| 18 |
SEPCO, China |
Erection of 4 Boilers (Package 'B' - Units 4 to 7) at 9x 135 MW CPP for Vedanta Aluminum Plant Jharsuguda, Orissa |
41 |
9 |
Nov-06 |
2010 |
Orissa |
| 19 |
RRVUNL |
EPC of BOP for 1 x 195 MW, Stage-V, Unit # 7, Kota Super Thermal Power Station, Rajasthan |
270 |
60 |
Oct-06 |
2010 |
Rajasthan |
| 20 |
SEPCO, Jharsuguda |
Erection and installation of Electrical and Instrumentation & control system for 9 x 135 MW Captive Power Plant Project , Vedanta Aluminum Plant, Jharsuguda, Orissa |
29 |
6 |
Jan-07 |
2010 |
Orissa |
| 21 |
HMCPCL |
BOP for 1x 30 MW unit3 Haldia Power Plant , West Bengal |
51 |
11 |
May-07 |
2010 |
West Bengal |
  |
| Sl No. |
Client |
Job Description |
Rounded off in Rs Cr. |
Rounded off in US $ in millions |
Start |
Expected Completion |
State |
PROJECTS UNDER EXECUTION |
| 1 |
Hindustan Zinc Limited, Udaipur |
EPC of BOP for 1x80 MW coal based power Plant for HZL-IV , Zawar, Udaipur Dist, Rajasthan |
150 |
33 |
Jan-07 |
2010 |
Rajasthan |
| 2 |
SEPCO III Power Construction Corporation |
Erection of 2 Nos. of Boilers (Package - 2) for 2X600 MW Thermal Power IPP Project at Jharsuguda, Orissa |
74 |
16 |
Jul-07 |
2011 |
Orissa |
| 3 |
Coastal Gujarat Power Ltd. (fully owned subsidiary of Tata Power) |
Site establishment works on cost plus basis for the 4000 MW Supercritical Ultra Mega Power Project, Mundra, Gujarat |
42 |
9 |
Oct-07 |
2010 |
Gujarat |
| 4 |
MAHAGENCO |
EPC of BOP for Bhusawal Thermal Power Station 2x500 MW Expansion project, Maharashtra |
1900 |
422 |
Nov-07 |
2010 |
Maharashtra |
| 5 |
BHEL |
EPC of Balance of Plant Systems for 2x80 MW Coal Based Captive power Plant at Dariba, Rajasthan for M/s HZL |
276 |
61 |
Apr-08 |
2010 |
Rajasthan |
| 6 |
BHEL |
EPC of Balance of Plant Systems for 2x80 MW Coal Based Captive power Plant at Dariba, Rajasthan for M/s HZL |
276 |
61 |
Apr-08 |
2010 |
Rajasthan |
| 7 |
Andhra Pradesh Power Development Company Ltd (APPDCL) |
Engineering, procurement and construction of BOP systems and equipment package and essential spares for 2x800 MW TPP at Krishnapatnam, Nellore Dt. |
2775 |
617 |
Feb-09 |
2012 |
Andhra Pradesh |
| 8 |
SIIL Tuticorin |
EPC of Balance of Plant Systems for 2x80 MW Coal Based Captive power Plant at Tuticorin. |
300 |
67 |
Jan-10 |
2011 |
Tamil Nadu |