Sl No. |
Client |
Job Description |
Start |
Completion |
Domestic/ Overseas |
COMPLETED PROJECTS (BEFORE SBU FORMATION) |
1 |
Liberia Electricity Corpn. |
O&M including Training of Personnel for Diesel Power Plant |
1978 |
1985 |
Overseas |
2 |
Saline Water Conversion Corp., Jeddah, Saudi Arabia |
Installation & commissioning of 4 x 64 MW Jeddah III Power Station |
1977 |
1978 |
Overseas |
3 |
Yanbu Industrial City, Saudi Arabia |
O&M of Power Generation and Distribution Systems |
1981 |
1983 |
Overseas |
4 |
Royal commission of Jubail and Yanbu,Saudi Arabia |
O&M of 8 x 60 MW Power Plant |
1981 |
1983 |
Overseas |
5 |
Tavanir Co., Ministry of Energy, Iran |
O&M of Thermal Power Stations and Training of Personnel |
1982 |
1991 |
Overseas |
6 |
National Electric Power Authority, Nigeria |
O&M including Training of Power System engineers for Thermal Power Plant & Systems (World Bank financed project) |
1982 |
1986 |
Overseas |
7 |
Department of Atomic Energy, Govt. of India, Manuguru, AP |
Design, detailed engineering, procurement, construction, erection and commissioning including total project management of Coal Based 3 x 30 MW Captive Thermal Power Plant for supply of Power & Process Steam to Khammam Chemical Refinery |
1982 |
1992 |
Domestic |
8 |
Maharashtra State Electricity Board |
Installation & commissioning of 4 x 108 MW Gas Turbine Units at Uran, Maharashtra for Maharashtra State Electricity Board |
1983 |
1985 |
Domestic |
9 |
Siemens, Germany |
Execution of 2 x 90 MW Gas Turbine Power Station at Connaught Bridge, Malaysia |
1983 |
1983 |
Overseas |
10 |
National Power Authority, Sierra Leone |
Training of Personnel in Utility Management (World Bank financed project) |
1983 |
1985 |
Overseas |
11 |
National Power Authority, Sierra Leone |
Training of Personnel in Technical Management (World Bank financed project) |
1983 |
1985 |
Overseas |
12 |
Mangalore Chemicals |
Construction & supervision of DG 6 x 6.5 MW Power Plant (DG Sets supplied by Wartsila, Finland) |
1984 |
1986 |
Domestic |
13 |
National Electricity Board, Malaysia |
O&M and Training of NEB’s operation personnel at 500 MW Simulator in Mumbai, India |
1984 |
1985 |
Overseas |
14 |
Karnataka Power Corpn., Bangalore |
O&M including Training of Power Plant Personnel for 2 x 210 MW Thermal Power Plant |
1985 |
1988 |
Domestic |
15 |
NEI Projects (India) Ltd., New Delhi |
Installation of 2 x 500 MW TG Sets and Associated Auxiliaries including Piping and Boiler Feed Pumps of NTPC, Rihandnagar, UP |
1986 |
1989 |
Domestic |
16 |
Tata Electric Cos., Mumbai |
Installation of 1 x 500 MW Boiler (Unit-VI) |
1986 |
1988 |
Domestic |
17 |
Uttar Pradesh Rajya Vidyuth Nigam, Lucknow |
Commissioning of 2 x 210 MW Power Plant at Unchahar, Rae Bareilly, UP, India |
1989 |
1990 |
Domestic |
18 |
Karnataka Electricity Board, Bangalore |
Erection, testing & commissioning of 6 x 20 MW DG Power Plant (DG sets supplied by SEMT, Pielstick) |
1991 |
1992 |
Domestic |
19 |
Renusagar Power Co., Renusagar, UP |
Review of O&M Practices for 2 x 67.5 MW, 2 x 74 MW & 1 x 68 MW Power Plant |
1991 |
1991 |
Domestic |
20 |
Tavanir Co., Ministry of Energy, Iran |
Project Management services for 4 x 250 MW Shahid Rajai Thermal Power Plant, Qazvin, Iran |
1991 |
1996 |
Overseas |
21 |
Tavanir Co., Ministry of Energy, Iran |
Material Management Services in Tehran |
1991 |
1994 |
Overseas |
22 |
Sunsari Morang Irrigation Project, Biratnagar, Nepal |
Supply, installation, commissioning and 2 years operation & maintenance of 2 x 1.664 MW Hydro Power Plant |
1993 |
1997 |
Overseas |
23 |
DRDL ,Hyderabad |
Design, Fabrication, Erection, Testing and Commissioning of Hydro basin facility |
1993 |
1994 |
Domestic |
24 |
Tavanir Co., Ministry of Energy,Iran |
Project Management services for 4 x 250 MW GHARB Thermal Power Plant, Hamedan, Iran |
1995 |
1996 |
Overseas |
25 |
International Technology Park Ltd., Bangalore |
Turnkey execution and commissioning of 3 x 3 MW (Phase-I) Diesel Power Captive Plant comprising 3 DG sets each capable of delivering 3000 KW net output at Whitefield, Bangalore |
1996 |
1997 |
Domestic |
26 |
Tata Electric Cos., Mumbai |
Construction Power Supply-cum-Area Lighting System and supply of Equipment, erection, testing & commissioning for 2 x 120 MW Jojobera Thermal Power Plant, Jamshedpur |
1998 |
1999 |
Domestic |
27 |
Austrian Energy & Environment, SGP/ Waagner, Austria |
Installation of 2 x 120 MW Boiler Auxiliaries of Vasilikos Power Station, Unit I & II, Cyprus |
1998 |
2001 |
Overseas |
28 |
BHEL, Calcutta |
Installation, testing & commissioning of 2 X 120 MW Main Boilers of Unit II & III at Tata Electric Cos., Jojobera, Jamshedpur |
1999 |
2001 |
Domestic |
29 |
Ansaldo Energia SpA, Italy |
Supply of Balance of Boiler Island of Main Package for 2 x 210 MW Neyveli First Thermal Power Station for Neyveli Lignite Corpn. Ltd., Neyveli,Tamil Nadu |
1999 |
2004 |
Domestic |
30 |
Duke/Fluor Daniel B.V., Netherlands |
Pre Limited Notice to proceed activities between Sep’ 99 and Nov’ 99 for 2 x 260 MW Krishnapatnam ‘B’ Thermal Power Plant, Near Nellore AP |
1999 |
1999 |
Domestic |
31 |
Ansaldo Energia SpA, Italy |
Installation of Boilers of Main Package for 2 x 210 MW Neyveli First Thermal Power Station for Neyveli Lignite Corpn. Ltd., Neyveli, Tamil Nadu |
1999 |
2004 |
Domestic |
COMPLETED PROJECTS (AFTER SBU FORMATION) |
1 |
Neyveli Lignite Corpn. Ltd, Neyveli |
Civil works related to Roads & Drains (CO4-Package) of 2x21 OMW FirstThermal Power Station Expansion Project |
Jun-00 |
2003 |
Domestic |
2 |
Tata Electric Cos., Mumbai |
Design, manufacture, supply of equipment, performance test for 1 x 25 MW Thermal Power Plant,1 x 110 TPH BFBC Steam Generator with all its Auxiliaries and Complete Raw Water System Equipment and Piping including all the Civil and Enabling Works, Wadi |
Aug-00 |
2002 |
Domestic |
3 |
Bharat Heavy Electricals Ltd., Chennai |
Handling at site stores/storage yard, transportation to site of work, erection, testing and commissioning of structures, pressure parts, non pressure parts, air pre heaters, ducts and supply and application of final painting of Boiler for Unit -IV of 4 x 500 MW Units at Talcher Super Thermal Power Project Stage II for NTPC Talcher, Orissa State |
Nov-00 |
2001 |
Domestic |
4 |
Bharat Heavy Electricals Ltd., Chennai |
Simhadri Thermal Power Project -Handling at Site Store/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Power Cycle Piping andSGAux.PipingforUnit2of2x500MW Sets at NTPC Simhadri TPP, Vizag, AP |
Jul-01 |
2002 |
Domestic |
5 |
Alstom Power India Ltd., Baroda |
Unloading at site, storage, material handling at site, security, erection, testing and commissioning assistance for complete mechanical and electrical worksof4 x 500 MWESP package at Talcher Super Thermal Power Station |
Feb-01 |
2002 |
Domestic |
6 |
Bharat Heavy Electricals Ltd., Chennai |
Handling at Site Stores/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Structures, Pressure Parts, Non -Pressure Parts, Air Pre-heaters, Ducts & Supply and Application of Final Painting of Boiler for Unit VI of 4 x 500 MW Sets at Talcher Super Thermal Power Project Stage II for NTPC, Angul Dist, Orissa State |
Feb-01 |
2003 |
Domestic |
7 |
BHEL, Noida |
EPC of BOP for 2 x 210 MW Coal Based Power Plant as Extension Units 3 & 4 at Parichha, UP |
Oct-02 |
2008 |
Domestic |
8 |
BHEL, Nagpur |
Unloading & Positioning of Boiler Drum, collection of materials from BHEL / Client’s stores / storage yard, transportation to site, erection, testing and commissioning, trial operation and handing over of Boiler and its Auxiliaries - Rotating machines including mills, ducts and fuel piping etc. of 1 x 500 MW Unit#3 at Rihand Thermal Power Station, Rihand, Dist. Sonbhadra, UP State |
Sep-02 |
2005 |
Domestic |
9 |
BHEL, Nagpur |
Supply & Erection of BoP equipment for 2 x 77 MW CPP for Hindustan Zinc Ltd., Chanderia, Chittorgarh Dist., Rajasthan |
May-03 |
2005 |
Domestic |
10 |
BHEL, Nagpur |
Transportation & positioning of boiler drum, collection of materials from BHEL / Clients’ stores / storage yard, transportation to site, erection, testing & commissioning, trial operation and handing over of boiler and its auxiliaries, rotating machines including mills, ducts & fuel piping etc. of 500 MW Unit # 9 Stage-Ill at Vindhyachal STPP, Madhya Pradesh |
Jan-04 |
2008 |
Domestic |
11 |
BHEL, Chennai |
Handling at site stores / storage yard, transportation to site office, erection, testing and commissioning of structures, pressure parts, non-pressure parts, air pre heaters, ducts and supply and application of final painting at Unit 1 of 2 x 500 MW sets at Sipat TPP, Bilaspur , Chattisgarh |
Sep-04 |
2008 |
Domestic |
12 |
Hindustan Zinc Limited, Udaypur |
EPC of BOP for 1x80 MW unit#3 CPP of HZL , Chenderiah, Rajasthan |
Jan-06 |
2008 |
Domestic |