Sl No.

Client

Job Description

Start

Completion

Domestic/ Overseas

COMPLETED PROJECTS (BEFORE SBU FORMATION)

1

Liberia Electricity Corpn.

O&M including Training of Personnel for Diesel Power Plant

1978

1985

Overseas

2

Saline Water Conversion Corp., Jeddah, Saudi Arabia

Installation & commissioning of 4 x 64 MW Jeddah III Power Station

1977

1978

Overseas

3

Yanbu Industrial City, Saudi Arabia

O&M of Power Generation and Distribution Systems

1981

1983

Overseas

4

Royal commission of Jubail and Yanbu,Saudi Arabia

O&M of 8 x 60 MW Power Plant

1981

1983

Overseas

5

Tavanir Co., Ministry of Energy, Iran

O&M of Thermal Power Stations and Training of Personnel

1982

1991

Overseas

6

National Electric Power Authority, Nigeria

O&M including Training of Power System engineers for Thermal Power Plant & Systems (World Bank financed project)

1982

1986

Overseas

7

Department of Atomic Energy, Govt. of India, Manuguru, AP

Design, detailed engineering, procurement, construction, erection and commissioning including total project management of Coal Based 3 x 30 MW Captive Thermal Power Plant for supply of Power & Process Steam to Khammam Chemical Refinery

1982

1992

Domestic

8

Maharashtra State Electricity Board

Installation & commissioning of 4 x 108 MW Gas Turbine Units at Uran, Maharashtra for Maharashtra State Electricity Board

1983

1985

Domestic

9

Siemens, Germany

Execution of 2 x 90 MW Gas Turbine Power Station at Connaught Bridge, Malaysia

1983

1983

Overseas

10

National Power Authority, Sierra Leone

Training of Personnel in Utility Management (World Bank financed project)

1983

1985

Overseas

11

National Power Authority, Sierra Leone

Training of Personnel in Technical Management (World Bank financed project)

1983

1985

Overseas

12

Mangalore Chemicals

Construction & supervision of DG 6 x 6.5 MW Power Plant (DG Sets supplied by Wartsila, Finland)

1984

1986

Domestic

13

National Electricity Board, Malaysia

O&M and Training of NEB’s operation personnel at 500 MW Simulator in Mumbai, India

1984

1985

Overseas

14

Karnataka Power Corpn., Bangalore

O&M including Training of Power Plant Personnel for 2 x 210 MW Thermal Power Plant

1985

1988

Domestic

15

NEI Projects (India) Ltd., New Delhi

Installation of 2 x 500 MW TG Sets and Associated Auxiliaries including Piping and Boiler Feed Pumps of NTPC, Rihandnagar, UP

1986

1989

Domestic

16

Tata Electric Cos., Mumbai

Installation of 1 x 500 MW Boiler (Unit-VI)

1986

1988

Domestic

17

Uttar Pradesh Rajya Vidyuth Nigam, Lucknow

Commissioning of 2 x 210 MW Power Plant at Unchahar, Rae Bareilly, UP, India

1989

1990

Domestic

18

Karnataka Electricity Board, Bangalore

Erection, testing & commissioning of 6 x 20 MW DG Power Plant (DG sets supplied by SEMT, Pielstick)

1991

1992

Domestic

19

Renusagar Power Co., Renusagar, UP

Review of O&M Practices for 2 x 67.5 MW, 2 x 74 MW & 1 x 68 MW Power Plant

1991

1991

Domestic

20

Tavanir Co., Ministry of Energy, Iran

Project Management services for 4 x 250 MW Shahid Rajai Thermal Power Plant, Qazvin, Iran

1991

1996

Overseas

21

Tavanir Co., Ministry of Energy, Iran

Material Management Services in Tehran

1991

1994

Overseas

22

Sunsari Morang Irrigation Project, Biratnagar, Nepal

Supply, installation, commissioning and 2 years operation & maintenance of 2 x 1.664 MW Hydro Power Plant

1993

1997

Overseas

23

DRDL ,Hyderabad

Design, Fabrication, Erection, Testing and Commissioning of Hydro basin facility

1993

1994

Domestic

24

Tavanir Co., Ministry of Energy,Iran

Project Management services for 4 x 250 MW GHARB Thermal Power Plant, Hamedan, Iran

1995

1996

Overseas

25

International Technology Park Ltd., Bangalore

Turnkey execution and commissioning of 3 x 3 MW (Phase-I) Diesel Power Captive Plant comprising 3 DG sets each capable of delivering 3000 KW net output at Whitefield, Bangalore

1996

1997

Domestic

26

Tata Electric Cos., Mumbai

Construction Power Supply-cum-Area Lighting System and supply of Equipment, erection, testing & commissioning for 2 x 120 MW Jojobera Thermal Power Plant, Jamshedpur

1998

1999

Domestic

27

Austrian Energy & Environment, SGP/ Waagner, Austria

Installation of 2 x 120 MW Boiler Auxiliaries of Vasilikos Power Station, Unit I & II, Cyprus

1998

2001

Overseas

28

BHEL, Calcutta

Installation, testing & commissioning of 2 X 120 MW Main Boilers of Unit II & III at Tata Electric Cos., Jojobera, Jamshedpur

1999

2001

Domestic

29

Ansaldo Energia SpA, Italy

Supply of Balance of Boiler Island of Main Package for 2 x 210 MW Neyveli First Thermal Power Station for Neyveli Lignite Corpn. Ltd., Neyveli,Tamil Nadu

1999

2004

Domestic

30

Duke/Fluor Daniel B.V., Netherlands

Pre Limited Notice to proceed activities between Sep’ 99 and Nov’ 99 for 2 x 260 MW Krishnapatnam ‘B’ Thermal Power Plant, Near Nellore AP

1999

1999

Domestic

31

Ansaldo Energia SpA, Italy

Installation of Boilers of Main Package for 2 x 210 MW Neyveli First Thermal Power Station for Neyveli Lignite Corpn. Ltd., Neyveli, Tamil Nadu

1999

2004

Domestic

COMPLETED PROJECTS (AFTER SBU FORMATION)

1

Neyveli Lignite Corpn. Ltd, Neyveli

Civil works related to Roads & Drains (CO4-Package) of 2x21 OMW FirstThermal Power Station Expansion Project

Jun-00

2003

Domestic

2

Tata Electric Cos., Mumbai

Design, manufacture, supply of equipment, performance test for 1 x 25 MW Thermal Power Plant,1 x 110 TPH BFBC Steam Generator with all its Auxiliaries and Complete Raw Water System Equipment and Piping including all the Civil and Enabling Works, Wadi

Aug-00

2002

Domestic

3

Bharat Heavy Electricals Ltd., Chennai

Handling at site stores/storage yard, transportation to site of work, erection, testing and commissioning of structures, pressure parts, non pressure parts, air pre heaters, ducts and supply and application of final painting of Boiler for Unit -IV of 4 x 500 MW Units at Talcher Super Thermal Power Project Stage II for NTPC Talcher, Orissa State

Nov-00

2001

Domestic

4

Bharat Heavy Electricals Ltd., Chennai

Simhadri Thermal Power Project -Handling at Site Store/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Power Cycle Piping andSGAux.PipingforUnit2of2x500MW Sets at NTPC Simhadri TPP, Vizag, AP

Jul-01

2002

Domestic

5

Alstom Power India Ltd., Baroda

Unloading at site, storage, material handling at site, security, erection, testing and commissioning assistance for complete mechanical and electrical worksof4 x 500 MWESP package at Talcher Super Thermal Power Station

Feb-01

2002

Domestic

6

Bharat Heavy Electricals Ltd., Chennai

Handling at Site Stores/Storage Yard, Transportation to Site of Work, Erection, Testing & Commissioning of Structures, Pressure Parts, Non -Pressure Parts, Air Pre-heaters, Ducts & Supply and Application of Final Painting of Boiler for Unit VI of 4 x 500 MW Sets at Talcher  Super Thermal Power Project Stage II for NTPC, Angul  Dist, Orissa State

Feb-01

2003

Domestic

7

BHEL, Noida

EPC of BOP for 2 x 210 MW Coal Based Power Plant as Extension Units 3 & 4 at Parichha, UP

Oct-02

2008

Domestic

8

BHEL, Nagpur

Unloading & Positioning of Boiler Drum, collection of materials from BHEL / Client’s stores / storage yard, transportation to site, erection, testing and commissioning, trial operation and handing over of Boiler and its Auxiliaries - Rotating machines including mills, ducts and fuel piping etc. of 1 x 500 MW Unit#3 at Rihand Thermal Power Station, Rihand, Dist. Sonbhadra, UP State

Sep-02

2005

Domestic

9

BHEL, Nagpur

Supply & Erection  of BoP equipment for 2 x 77 MW CPP for Hindustan Zinc Ltd., Chanderia, Chittorgarh Dist., Rajasthan

May-03

2005

Domestic

10

BHEL, Nagpur

Transportation & positioning of boiler drum, collection of materials from BHEL / Clients’ stores / storage yard, transportation to site, erection, testing & commissioning, trial operation and handing over of boiler and its auxiliaries, rotating machines including mills, ducts & fuel piping etc. of 500 MW Unit # 9 Stage-Ill at Vindhyachal STPP, Madhya Pradesh

Jan-04

2008

Domestic

11

BHEL, Chennai

Handling at site stores / storage yard, transportation to site office, erection, testing and commissioning of structures, pressure parts, non-pressure parts, air pre heaters, ducts and supply and application of final painting at Unit 1 of 2 x 500 MW sets at Sipat TPP, Bilaspur , Chattisgarh

Sep-04

2008

Domestic

12

Hindustan Zinc Limited, Udaypur

EPC of BOP  for 1x80 MW unit#3 CPP of HZL , Chenderiah, Rajasthan

Jan-06

2008

Domestic

 
     