| Sl No. |
Client |
Job Description |
Rounded off in Rs Cr. |
Rounded off in US $ in millions |
Start |
Completed |
State |
PROJECTS EXECUTED |
| 1 |
Sumitomo Corpn., Tokyo |
Supply & Installation of 400 kV XLPE Power Cable Project at Srisailam Left Bank |
6 |
1.4 |
Feb-00 |
2002 |
Andhra Pradesh  |
| 2 |
Maharashtra State Electricity Board, Maharashtra |
Turnkey execution of 132 kV & 33 kV Substations including interconnecting lines under Power System Improvement Project in Jalna System in Jalna District (OECF MSEB) |
16 |
3.6 |
Mar-00 |
2003 |
Maharashtra |
| 3 |
Maharashtra State Electricity Board, Maharashtra |
Turnkey execution of 132 kV & 33 kV Substations including interconnecting lines under Power System Improvement Project in Nilanga System in Latur District (OECF MSEB) |
23 |
5.2 |
Mar-00 |
2003 |
Maharashtra |
| 4 |
Haryana Vidyut Prasaran Nigam Ltd., Hisar,Haryana |
Supply and Installation of 220 kV Double Circuit Transmission Line from Palli to Badshapur for Haryana State Power Sector Restructuring Project |
4 |
1.0 |
Mar-00 |
2004 |
Haryana |
| 5 |
TataTelecom Ltd., Gurgaon,New Delhi |
SDH Backbone Network -Civil works, supply and services for 28 new backbone sites for Birla AT & T |
8 |
1.9 |
Aug-00 |
2004 |
Delhi |
| 6 |
POWERGRID, Patna |
Installation and commissioning of 400 kV, 2 nos, 50 MVAR reactors and associated equipment at Sarnath400 Kv Substation of UPPCL for termination of 400 kV double circuit Bihar-Sharif-Sasaram-Allahabad Transmission Line |
1 |
0.2 |
Dec-00 |
2001 |
Bihar |
| 7 |
POWERGRID, Patna |
Supply of equipment and materials for installation and commissioning of 400 kV, 2 nos. 50 MVAR reactors and associated equipment at Sarnath 400 kV Substation of UPPCL for termination of 400 kV double circuit Bhiar-Sharif-Sasaram-Allahabad Transmission Lin |
0.2 |
0.04 |
Dec-00 |
2005 |
Bihar |
| 8 |
Kerala State Electricity Board, Kozhikode |
Turnkey execution of 110/33 kV / 11 kV Substation (1 no.), 33 / 11 kV Substations (3 nos.) and 33 kV Transmission Lines 30 kms. and 11 kV Transmission Lines 25 kms, 11 kV (5 nos.), 600 KVAR capacitors Distribution Project at Palakkad district of Kerala |
11 |
2.4 |
Apr-01 |
2003 |
Kerala |
| 9 |
Kerala State Electricity Board, Thiruvananthapuram |
Construction of 220 kV D/C LILO Lines, 31.5 kms. (twin moose,23 kms and single moose,8.5 kms.) to 220 kV Substations at Kundra and Edappon from the 220 kV Kayamkulam - Edamon double circuit feeder on turnkey basis |
39 |
8.6 |
May-01 |
2005 |
Kerala |
| 10 |
Haryana Vidyut Prasaran Nigam Ltd., Haryana |
Supply and erection of equipment for turnkey construction of 220 kV and 132 kV Transmission Lines for 220 kV Substation at Rania and 132 kV Substations at Madhosinghana, Ellenabad, Kariwala and Odhan |
12 |
2.7 |
Jun-01 |
2004 |
Haryana |
| 11 |
Haryana Vidyut Prasaran Nigam Ltd., Haryana |
Supply and erection of equipment for turnkey construction of 220 kV and 132 kV Transmission Lines for 220 kV Substation at Cheeka and 132 kV Substations at Chakuladana, Padla, Kangthali and Bhagal |
10 |
2.1 |
Jun-01 |
2004 |
Haryana |
| 12 |
POWERGRID, Gurgaon |
Supply and erection of equipment and materials for 220kV Transmission Lines associated with Transmission System Strengthening of Electricity Department, Government of Goa |
9 |
2.1 |
Dec-01 |
2003 |
Maharashtra |
| 13 |
POWERGRID, Gurgaon |
Supply and erection of Equipment & Material for 400 kV D/C Dhauliganga (NHPC) -Bareily (UPPCL) Transmission Line under Dhauliganga Transmission System |
71 |
15.8 |
Mar-02 |
2005 |
Uttar Pradesh |
| 14 |
ADWEA |
Lot (1)-Installation of 33/11 kV, 15 MVA Package Units -(3 nos.) at Wadi Sulaimi & Meryal Al Ain. Lot (2)-Installation of 33/11 kV, 15 MVA Transformers at Zakher Grid. |
5 |
1.0 |
Apr-02 |
2005 |
Gujarat |
| 15 |
POWERGRID, Gurgaon |
Supply and erection of 400 KV Extension Bays from Power Grid for Ramagundam Stage -III Project,Package “B” |
14 |
3.1 |
Jun-02 |
2005 |
Andhra Pradesh |
| 16 |
TPCL, New Delhi |
Construction of 400kV D/C Kishenpur-Thathar Transmission Line (Package A) for POWERGRID in the state of Jammu & Kashmir |
53 |
11.7 |
Aug-02 |
2008 |
Jammu & Kashmir |
| 17 |
TPCL, New Delhi |
Construction of 400kV D/C Thathar-Wagoora Transmission Line (Package B) for POWERGRID in the state of Jammu & Kashmir |
34 |
7.5 |
Aug-02 |
2007 |
Jammu & Kashmir |
| 18 |
POWERGRID, Gurgaon |
Supply and erection of equipment / materials for construction of 400kV D/C Tarapur - Boisar Line, LILO of 400 kV SIC Gandhar - Padghe Line at Boisar and 220 kV S/C Tarapur-Boisar Line (P-A1) for Tarapur Extension Transmission system |
26 |
5.7 |
Jul-03 |
2005 |
Maharashtra |
| 19 |
New Delhi Power Ltd. (NDPL), Delhi |
Supply and erection of High Voltage Distribution System (HVDS), Ibrahimpur Extension |
1 |
0.2 |
Jul-03 |
2005 |
Uttar Pradesh |
| 20 |
New Delhi Power Ltd. (NDPL), Delhi |
Supply and erection of High Voltage Distribution System (HVDS), Kadhi Vihar, Dist. Narela |
1 |
0.3 |
Aug-03 |
2005 |
Delhi |
| 21 |
POWERGRID, Gurgaon |
Supply and erection of equipment and materials for Tower Package (package-C) for 400 kV DC Vishnuprayag –Muzaffarnagar Transmission Line Part III |
61 |
13.5 |
Oct-03 |
2006 |
Uttar Pradesh |
| 22 |
POWERGRID, Gurgaon |
Supply and erection of 33 kV underground cable for alternate power supply to Panjim in North Goa Circle of Electricity Department, Government of Goa |
3 |
0.6 |
Oct-03 |
2005 |
Maharashtra |
| 23 |
POWERGRID, Gurgaon |
Detailed survey of Transmission Lines associated with RAPP-C Transmission System using Modern Survey Techniques like Satellite Imageries, Total Stations, GPS |
1 |
0.2 |
Mar-04 |
2005 |
Delhi |
| 24 |
POWERGRID, Gurgaon |
Detailed survey of Transmission Lines associated with Sipat-ll Supplementary Transmission System & System Strengthening Scheme-l of WR using Modern Survey Techniques |
1 |
0.2 |
June-04 |
2006 |
Uttar Pradesh |
| 25 |
POWERGRID, Gurgaon |
supply and erection of equipment and materials for turnkey package for diversification / modification of existing 400 kV D/C Uri-Wagoora-Pampore Transmission Line |
38 |
8.5 |
Aug-04 |
2007 |
Jammu & Kashmir |
| 26 |
POWERGRID, Gurgaon |
Detailed survey of transmission lines associated with RAPP 5 & 6 supplementary transmission system using modern survey techniques like satellite imageries, total stations, GPS etc. |
1 |
0.2 |
Dec-04 |
2006 |
Delhi |
| 27 |
POWERGRID, Gurgaon |
Detailed survey of transmission lines associated with NRSS-V transmission system using modern survey techniques like satellite imageries, total stations, GPS etc. |
1 |
0.1 |
Dec-04 |
2006 |
Delhi |
| 28 |
TPCL, New Delhi |
Construction of tower package (package A1) 400 kV D/C (QUAD) Seoni -Khandwa Transmission Line Part II (115 km) associated with Sipat-l |
30 |
6.1 |
Dec-04 |
2007 |
Madhya Pradesh |
| 29 |
POWERGRID, Nagpur |
Detailed survey of transmission lines associated with Kawas II and Gandhar II (project) using modern survey techniques -Package B |
1 |
0.2 |
Feb-05 |
2006 |
Gujarat |
| 30 |
POWERGRID, Nagpur |
Detailed survey of transmission lines associated with Kawas II and Gandhar II (project) using modern survey techniques -Package C |
1 |
0.1 |
Feb-05 |
2006 |
Gujarat |
| 31 |
TPCL, New Delhi |
Erection of 400kV D/C Darjeeling-New Siliguri Section of Teesta-V HEP -New Siliguri Transmission Line (Package B) |
38 |
8.4 |
May-05 |
2008 |
Assam |
| 32 |
TPCL, Kolkata |
400 kV D/C Kanpur -(Package - A) Auriya Transmission Line |
10 |
2.2 |
Apr-05 |
2006 |
Uttar Pradesh |
| 33 |
POWERGRID, Gurgaon |
Design, Engineering, Manufacture, Factory Testing, Supply, Erection including associated Civil works, Testing & Commissioning of 400KV bay extension at Kishenpur Substation |
57 |
12.6 |
Jul-05 |
2006 |
Uttar Pradesh |
| 34 |
Uttranchal Power Corporation Limited |
Electrification of Villages & their households on turnkey basis at Pauri, Uttranchal |
92 |
20.4 |
Dec-05 |
2007 |
Uttaranchal |
| 35 |
Uttranchal Power Corporation Limited |
Electrification of Villages & their households on turnkey basis at Chamoli, Uttranchal |
48 |
10.6 |
Dec-05 |
2007 |
Uttaranchal |
| 36 |
POWERGRID, Gurgaon |
Construction, Testing & Commissioning of 400 KV D/C Ranchi-Pillki transmission lines |
21 |
4.7 |
Oct-05 |
2007 |
Jharkhand |
| 37 |
Tata Power Company Limited |
Design, Procurement, Testing and supply of components excluding OPGW materials & aviation lights, for a 220 kV four circuit transmission line at Trombay |
6 |
1.3 |
Mar-06 |
2006 |
Maharashtra |
| 38 |
Tata Power Company Limited |
Erection, Testing, commissioning of new four circuit line and dismantling of existing 2 x 110 kV ICT 4/5 & 2 x 220 kV MSEB Tie lines |
1 |
0.2 |
Mar-06 |
2006 |
Maharashtra |
| 39 |
POWERGRID, Jammu |
Installation of 3 nos. Towers in left circuit of 400 KV Kishenpur- wagoora line in Peer-Panjal area for replacement of collapsed L11 & L18 towers, J&K |
2 |
0.4 |
Mar-07 |
2008 |
Jammu & Kashmir |
| 40 |
Tata Steel |
Design, manufacture, supply and delivery of Optical ground wire and accessories for 132 KV Transmission lines from Golmuri to MRSS Substation. |
0.2 |
0.04 |
Mar-07 |
2007 |
Jharkhand |
| 41 |
UPCL |
Additional work of Pauri-II Rural Electrification work on Turnkey basis , Uttaranchal |
24 |
5.4 |
Feb-08 |
2009 |
Uttaranchal |
| 42 |
UPCL |
Additional work of Chamoli-II Rural Electrification work on Turnkey basis, Uttaranchal |
11 |
2.5 |
Feb-08 |
2009 |
Uttaranchal |
| 43 |
Tata Power Company Limited |
132 kV Transmission Line and related modifications for line from Jojobera to Tata Steel , Jharkhand |
14 |
3 |
Dec-06 |
2009 |
Jharkhand |
| 44 |
JUSCO |
Supply and erection of 132 kV Transmission Line Project from Golf Club to Bara to Sonari (Pkg B), Jharkhand |
5 |
1 |
Dec-06 |
2009 |
Jharkhand |
| 45 |
JUSCO |
Supply and erection of 132 KV Transmission Line Project from Jojobera to Tata Growth Shop (Pkg C), Jharkhand |
14 |
3 |
Dec-06 |
2009 |
Jharkhand |
  |
| Sl No. |
Client |
Job Description |
Rounded off in Rs Cr. |
Rounded off in US $ in millions |
Start |
Expected Completion |
State |
PROJECTS UNDER EXECUTION |
| 1 |
POWERGRID |
Erection of 400kV D/C Tower Pkg.B under 3 & 4 Trans. System for Mysore-Kutta TL (118 KM) |
17 |
4 |
Dec-04 |
2010 |
Karnataka |
| 2 |
POWERGRID, Gurgaon |
Supply and erection of Tower Package G1 for 765 kV S/C Seoni Bina Transmission line , Madhya Pradesh |
111 |
25 |
Jun-06 |
2010 |
Madhya Pradesh |
| 3 |
POWERGRID, Gurgaon |
Supply and erection of Tower package A4 for Bhaddrak-Mendhasal Section of 400 KV D/C Baripada-Mendhasal T/L , Orissa |
80 |
18 |
Mar-07 |
2010 |
Orissa |
| 4 |
ACC – Bargarh Cement Works, Orissa |
Supply and erection of 33KV Overhead TL & associated switchyards and civil work at ACC- Bargarh cement works on turnkey basis including supply of maintenance spares & commissioning spares |
9 |
2 |
Apr-07 |
2010 |
Orissa |
| 5 |
POWERGRID, Gurgaon |
Supply and erection of equipment & materials for TL and SS package on Turnkey basis for Uri-2 Transmission system, J&K |
130 |
29 |
May-07 |
2010 |
Jammu Kashmir |
| 6 |
POWERGRID, Gurgaon |
Supply and erection of Tower package for 400 KV D/C Jamshedpur -Baripada TL (Pkg A2), Orissa |
85 |
19 |
May-07 |
2010 |
Orissa |
| 7 |
POWERGRID, Gurgaon |
Supply and erection of Tower package for 400 KV D/C Rourkela- Raigarh TL (Pkg A2) Orissa |
85 |
19 |
Jul-07 |
2010 |
Orissa |
| 8 |
Tata Power |
Civil Works, Supply, Installation and Commissioning of two 220 kV bays and construction of 220 kV Transmission Line at MSETCL Borivili, Mumbai |
16 |
4 |
Sep-07 |
2011 |
Maharasthra |
| 9 |
POWERGRID |
Supply and erection of Tower Package-A1 for 400kV D/C Parbati Pooling Point-Amritsar Transmission line (Part1) and LILO of 400 KV (Quadruple) Parbati-II Koladam/Pooling TL at Parbati Pooling Point of Parbati-III TL system |
100 |
22 |
Feb-08 |
2010 |
Himachal Pradesh |
| 10 |
M/S Industrial Energy Limited |
Supply, Erection, Testing & Commissioning of 132 kV Switchyard Bay Extension at Jojobera, Jamshedpur. |
8 |
2 |
May-08 |
2010 |
Jharkhand |
| 11 |
POWERGRID |
Supply and erection for Extension for 400 KV SS at Hyderabad, Munirabada, Hiriyur, Kolar & Kaiga associated with System strengthening-VIII in Southeren Region Grid (Pkg D) |
28 |
6 |
Jul-08 |
2010 |
Andhra Pradesh |
| 12 |
POWERGRID |
Exworks Supply and erection of Tower Package A3 for 400 KV D/C (Quad) Maithon Gaya Transmission Line associated with DVC & Maithon Right bank Transmission System |
161 |
36 |
Aug-08 |
2010 |
Bihar |
| 13 |
NESCL |
"EPC of Rural Electrification including house wiring for BPL Household etc. and associated accessories, special tools and tackles for the Rural Electrification works at Balangir, Orissa. |
85 |
19 |
Sep-08 |
2010 |
Orissa |
| 14 |
Tata Power |
Supply and erection of 220KV Four circuit Salsette-Saki Transmission Line |
24 |
5 |
Sep-08 |
2010 |
Maharasthra |
| 15 |
Tata Power |
Supply and erection of 220 KV Four circuit Mahul- Sewree Transmission line |
13 |
3 |
Sep-08 |
2010 |
Maharasthra |
| 16 |
POWERGRID |
Supply and erection of the 400 KV Double Circuit Transmission Line from Chamera (Himachal Pradesh) to Jallandhar (Punjab) associated with Chamera-III Transmission System. |
90 |
20 |
Oct-08 |
2010 |
Himachal Pradesh |
| 17 |
POWERGRID |
Supply and erection of 220 KV Trombay-Dharavi-Salsette Transmission line . |
113 |
25 |
|
2010 |
Maharasthra |
| 18 |
POWERGRID |
Supply and erection of 400 KV (Triple Conductor) Double Circuit (Mundra-Bachau- Lakhpat) Transmission Line for Mundra Mega Power Project. |
180 |
40 |
Jan-09 |
2011 |
Gujarat |
| 19 |
POWERGRID |
Replacement of disc insulator for NRTS-II, Package-A to D in J&K. |
12 |
3 |
Mar-09 |
2010 |
Jammu Kashmir  |
| 20 |
POWERGRID |
Supply and erection of tower Package A5 for Saharsa-Gopalganj section(Bihar) of 800 KV HVDC Biswanath Chariyali –Agra line associated with North East / Western interconnector |
180 |
40 |
May-09 |
2012 |
Bihar  |
| 21 |
POWERGRID |
765 kV Single Circuit Sasan- Silwar (Ckt-II) Transmission Line (125 KM) |
111 |
25 |
Nov-09 |
2011 |
Madhya Pradesh  |
| 22 |
POWERGRID |
Supply and erection of 800KV HVDC Barabisa Islampur Transmission Line West Bengal (283 KM) |
355 |
79 |
Jan-10 |
2013 |
West Bengal  |
| 23 |
TPCL |
Supply and erection of 220KV Salsette-Borivli, 110 KV Salsette -BMC/ 110 KV Borivli-Kolshet Transmission Line diversion |
6 |
1 |
Dec-09 |
2010 |
Maharashtra  |
| 24 |
POWERGRID |
Supply & Services for 765KV S/C Sasaram-Fatehpur Transmission Line associated with Sasan Ultra Mega Power Project (178KM)-Part-1 |
164 |
36 |
Mar-10 |
2012 |
Bihar  |
| 25 |
POWERGRID |
Supply & Services for 765KV S/C Sasaram-Fatehpur Transmission Line associated with Sasan Ultra Mega Power Project (178KM)-Part-2 |
164 |
36 |
Mar-10 |
2012 |
Bihar  |