  Our Presence - Domestic  
 
Project List updated up to August 2011
 
 
* Rounded off as appropriate
 
 

Sl No.

Client

Job Description

Project Value*

Start 

Completion 

State

In Rs Cr. In Million USD

PROJECTS EXECUTED

1 POWERGRID, Patna  Installation and commissioning of 400 kV, 2 nos, 50 MVAR reactors at Sarnath 400 Kv Substation of UPPCL  of 400 kV D/C Bihar-Sharif-Sasaram- TL 1 0 Dec-00 2001 Bihar
2 Sumitomo Corpn., Tokyo  Supply & Installation of 400 kV XLPE Power Cable Project at Srisailam Left Bank  10 2 Feb-00 2002 Andhra Pradesh
3 Maharashtra State Electricity Board, Maharashtra  Turnkey execution of 132 kV & 33 kV Substations including interconnecting lines under Power System Improvement Project in Jalna System in Jalna District (OECF MSEB)  20 4 Mar-00 2003 Maharashtra 
4 Maharashtra State Electricity Board, Maharashtra  Turnkey execution of 132 kV & 33 kV Substations including interconnecting lines under Power System Improvement Project in Nilanga System in Latur District (OECF MSEB)  25 6 Mar-00 2003 Maharashtra 
5 Kerala State Electricity Board, Kozhikode  Turnkey execution of 110/33 kV / 11 kV Substation (1 no.), 33 / 11 kV Substations (3 nos.) and 33 kV Transmission Lines and 11 kV Transmission Lines, 11 kV (5 nos.), 600 KVAR capacitors Distribution Project at Palakkad district of Kerala  15 3 Apr-01 2003 Kerala
6 POWERGRID, Gurgaon  Supply and erection  of equipment and materials for 220kV Transmission Lines associated with Transmission System Strengthening of Electricity Department, Government of Goa 10 2 Dec-01 2003 Maharashtra 
7 Haryana Vidyut Prasaran Nigam Ltd., Hisar,Haryana  Supply and Installation of 220 kV Double Circuit Transmission Line from Palli to Badshapur for Haryana State Power Sector Restructuring Project  5 1 Mar-00 2004 Haryana 
8 TataTelecom Ltd., Gurgaon,New Delhi  SDH Backbone Network -Civil works, supply and services for 28 new backbone sites for Birla AT & T  10 2  Aug-00 2004  Delhi 
9 Haryana Vidyut Prasaran Nigam Ltd., Haryana  Supply and erection  of equipment for turnkey construction of 220 kV and 132 kV Transmission Lines for 220 kV Substation at Rania and 132 kV Substations at Madhosinghana, Ellenabad, Kariwala and Odhan  15 3 Jun-01 2004 Haryana 
10 Haryana Vidyut Prasaran Nigam Ltd., Haryana  Supply and erection 220 kV and 132 kV TL for 220 kV Substation at Cheeka and 132 kV Substations at Chakuladana, Padla 10 2 Jun-01 2004 Haryana 
11 Kerala State Electricity Board, Thiruvananthapuram  Construction of 220 kV D/C LILO Lines, (twin moose, and single moose.) to 220 kV Substations at Kundra and Edappon from the 220 kV Kayamkulam - Edamon double circuit feeder on turnkey basis  40 9 May-01 2005 Kerala
12 POWERGRID, Gurgaon  Supply and erection of  Equipment & Material for 400 kV D/C Dhauliganga (NHPC) -Bareily (UPPCL) Transmission Line under Dhauliganga Transmission System  70 16 Mar-02 2005 Uttar Pradesh
13 POWERGRID, Gurgaon  400 KV Extension Bays  Stage -III Project -  Supply of goods for Substation Package "B" [Extension of 400 KV Kurnool, Gooty and Nelamangala 15 3 Apr-02 2005 Andhra Pradesh
14 ADWEA  Lot (1)-Installation of 33/11 kV, 15 MVA Package Units -(3 nos.) at Wadi Sulaimi & Meryal Al Ain. Lot (2)-Installation of 33/11 kV, 15 MVA Transformers at Zakher Grid.  5 1 Apr-02 2005 Gujarat
15 POWERGRID, Gurgaon  Supply and erection of 400 KV Extension Bays from Power Grid for Ramagundam Stage -III Project,Package “B”  15 3 Jun-02 2005 Andhra Pradesh
16 POWERGRID, Gurgaon  Supply and erection  of equipment / materials for construction of 400kV D/C Tarapur - Boisar Line, LILO of 400 kV SIC Gandhar - Padghe Line at Boisar and 220 kV S/C Tarapur-Boisar Line (P-A1) for Tarapur Extension Transmission system  25 6 Jul-03 2005 Maharashtra 
17 New Delhi Power Ltd. (NDPL), Delhi  Supply and erection of High Voltage Distribution System (HVDS), Ibrahimpur Extension  1 0 Jul-03 2005 Uttar Pradesh
18 New Delhi Power Ltd. (NDPL), Delhi  Supply and erection of High Voltage Distribution System (HVDS), Kadhi Vihar, Dist. Narela  2 0 Aug-03 2005 Delhi
19 POWERGRID, Gurgaon  Supply and erection of 33 kV underground cable for alternate power supply to Panjim in North Goa Circle of Electricity Department, Government of Goa  5 1 Oct-03 2005 Maharashtra 
20 POWERGRID, Gurgaon  Detailed survey of Transmission Lines associated with RAPP-C Transmission System using Modern Survey Techniques like Satellite Imageries, Total Stations, GPS  1 0 Mar-04 2005 Delhi
21 POWERGRID, Gurgaon  Detailed survey of Transmission Lines associated with Sipat-ll Supplementary Transmission System & System Strengthening Scheme-l of WR using Modern Survey Techniques  1 0 Jun-04 2006 Uttar Pradesh
22 POWERGRID, Gurgaon  Supply and erection of equipment and materials for Tower Package (package-C) for 400 kV DC Vishnuprayag  –Muzaffarnagar Transmission Line Part III  60 13 Oct-03 2006 Uttar Pradesh
23 POWERGRID, Gurgaon  Detailed survey of transmission lines associated with NRSS-V transmission system using modern survey techniques like satellite imageries, total stations, GPS etc.  1 0 Dec-04 2006 Delhi
24 POWERGRID, Gurgaon  Detailed survey of transmission lines associated with RAPP 5 & 6 supplementary transmission system using modern survey techniques like satellite imageries, total stations, GPS etc.  1 0 Dec-04 2006 Delhi
25 POWERGRID, Nagpur  Detailed survey of transmission lines associated with Kawas II and Gandhar II (project) using modern survey techniques -Package B  1 0 Feb-05 2006 Gujarat
26 POWERGRID, Nagpur  Detailed survey of transmission lines associated with Kawas II and Gandhar II (project) using modern survey techniques -Package C  1 0 Feb-05 2006 Gujarat
27 TPCL, Kolkata  400 kV D/C Kanpur -(Package - A) Auriya Transmission Line  10 2 Apr-05 2006 Uttar Pradesh
28 POWERGRID, Gurgaon  Design, Engineering, Manufacture, Factory Testing, Supply, Erection including associated Civil works, Testing & Commissioning of 400KV bay extension at Kishenpur Substation 55 12 Jul-05 2006 Uttar Pradesh
29 Tata Power Company Limited  Design, Procurement, Testing and supply of components excluding OPGW materials & aviation lights, for a 220 kV four circuit transmission line at Trombay  5 1 Mar-06 2006 Maharashtra 
30 Tata Power Company Limited  Erection, Testing, commissioning of new four circuit line and dismantling of existing 2 x 110 kV ICT 4/5 & 2 x 220 kV MSEB Tie lines  1 0 Mar-06 2006 Maharashtra 
31 POWERGRID, Gurgaon  Construction, Testing & Commissioning of 400 KV D/C Ranchi-Pillki  transmission lines 25 6 Oct-05 2007 Jharkhand
32 TPCL, New Delhi  Construction of tower package (package A1) 400 kV D/C (QUAD) Seoni -Khandwa Transmission Line Part II associated with Sipat 30 7 Dec-04 2007 Madhya Pradesh
33 POWERGRID, Gurgaon  supply and erection of equipment and materials for turnkey package for diversification / modification of existing 400 kV D/C Uri-Wagoora-Pampore Transmission Line  40 9 Aug-04 2007 Jammu & Kashmir
34 TPCL, New Delhi  Construction of 400kV D/C Thathar-Wagoora Transmission Line (Package B) for POWERGRID in the state of Jammu & Kashmir  35 8 Aug-02 2007 Jammu & Kashmir
35 Tata Steel Design, manufacture, supply and delivery of Optical ground wire and accessories for 132 KV Transmission lines from Golmuri to MRSS Substation. 1.0 0 Mar-07 2007 Jharkhand
36 TPCL, New Delhi  Construction of 400kV D/C Kishenpur-Thathar Transmission Line (Package A) for POWERGRID in the state of Jammu & Kashmir  55 12 Aug-02 2008 Jammu & Kashmir
37 TPCL, New Delhi  Erection of 400kV D/C Darjeeling-New Siliguri Section of Teesta-V HEP -New Siliguri Transmission Line (Package B)  35 8 May-05 2008 Assam
38 POWERGRID, Jammu Installation of 3 nos. Towers in left circuit of 400 KV Kishenpur- wagoora line in Peer-Panjal area for replacement of collapsed L11 & L18 towers, J&K 2 0 Mar-07 2008 Jammu & Kashmir
39 Uttranchal Power Corporation Limited Electrification of Villages & their households on turnkey basis at Pauri, Uttranchal 90 20 Dec-05 2009 Uttranchal
40 Uttranchal Power Corporation Limited Electrification of Villages & their households on turnkey basis at Chamoli, Uttranchal 50 11 Dec-05 2009 Uttranchal
41 UPCL Additional work of Pauri-II Rural Electrification  work on Turnkey basis , Uttaranchal 25 6 Feb-08 2009 Uttaranchal
42 UPCL Additional work of Chamoli-II Rural Electrification work on Turnkey basis, Uttaranchal 15 3 Feb-08 2009 Uttaranchal
43 Tata Power Company Limited  132 kV Transmission Line and related modifications for line from Jojobera to Tata Steel , Jharkhand 15 3 Dec-06 2009 Jharkhand
44 JUSCO Supply and erection of 132 kV Transmission Line Project from Golf Club to Bara to Sonari (Pkg B), Jharkhand 5 1 Dec-06 2009 Jharkhand
45 JUSCO Supply and erection of  132 KV Transmission Line Project from Jojobera to Tata Growth Shop (Pkg C), Jharkhand 15 3 Dec-06 2009 Jharkhand
46 ACC – Bargarh Cement Works, Orissa    Supply and erection of 33KV Overhead TL & associated switchyards and civil work  at ACC- Bargarh cement works on turnkey basis including supply of maintenance spares & commissioning spares 10 2 Apr-07 2009 Orissa
47 M/S Industrial Energy Limited  Supply, Erection, Testing & Commissioning of 132 kV Switchyard Bay Extension at Jojobera, Jamshedpur.  10 2 May-08 2009 Jharkhand
48 POWERGRID, Gurgaon  Supply and erection of Tower Package G1 for 765 kV S/C Seoni Bina Transmission line , Madhya Pradesh 105 23 Jun-06 2010 Madhya Pradesh
49 POWERGRID, Gurgaon  Erection of 400kV D/C Tower Pkg. B under 3 & 4 Trans. System for Mysore-Kutta TL  20 4 Dec-05 2010 Karnataka
50 POWERGRID, Gurgaon   Supply and erection of Tower package A4 for Bhadrak-Mendhasal Section of 400 KV D/C 85 19 Mar-07 2011 Odisha
51 POWERGRID, Gurgaon   Supply and erection of Tower package for 400 KV D/C Rourkela- Raigarh TL (Pkg A2) Odisha 95 21 Jul-07 2011 Odisha
52 POWERGRID  Supply and erection for Extension for 400 KV SS at Hyderabad, Munirabada, Hiriyur, Kolar & Kaiga associated with System strengthening-VIII in Southeren Region Grid (Pkg D) 30 7 Jul-08 2011 Andhra Pradesh
53 POWERGRID Supply and erection of 400 KV (Triple Conductor) Double Circuit (Mundra-Bachau- Lakhpat) Transmission Line for Mundra Mega Power Project 180 40 Jan-09 2011 Gujarat
54 POWERGRID Carrying out restoration works of 400kV D/C Siliguri-Purnea T/L. 1 0 May-10 2011 West Bengal
55 Tata Power Supply and erection of 220KV Salsette-Borivli, 110 KV Salsette -BMC/ 110 KV Borivli-Kolshet Transmission Line diversion 10 2 Dec-09 2011 Maharasthra
 

Sl No.

Client

Job Description

Project Value*

Start 

Completion 

State

In Rs Cr. In Million USD

PROJECTS UNDER EXECUTION

1 POWERGRID Supply and erection of equipment & materials for TL and SS package on Turnkey basis for Uri-2 Transmission system, J&K 150 33 May-07 May-11 Jammu Kashmir
2 POWERGRID Supply and erection of Tower package for 400 KV D/C Jamshedpur -Baripada TL (Pkg A2), Odisha 90 20 May-07 Mar-12 Odisha
3 Tata Power Civil Works, Supply, Installation and Commissioning of two 220 kV bays and construction of 220 kV Transmission Line at MSETCL Borivili, Mumbai 20 4 Sep-07 Jun - 11 Maharasthra
4 POWERGRID Supply and erection of Tower Package-A1 for 400kV D/C Parbati Pooling Point-Amritsar Transmission line (Part1) and LILO of 400 KV (Quadruple) Parbati-II Koladam/Pooling TL at Parbati Pooling Point of Parbati-III TL system 120 27 Feb-08 Dec-11 Himachal Pradesh
5 POWERGRID Supply and erection of Tower Package A3 for 400 KV D/C (Quad) Maithon Gaya Transmission Line associated with DVC & Maithon Right bank Transmission System  190 42 Aug-08 Nov-11 Bihar
6 NESCL EPC of Rural Electrification including house wiring for BPL Household at Balangir, Odisha 90 20 Sep-08 Mar-12 Odisha
7 Tata Power Supply and erection of 220KV Four circuit Salsette-Saki Transmission Line 25 6 Sep-08 Sep-10 Maharasthra
8 Tata Power Supply and erection of 220 KV Four circuit Mahul- Sewree Transmission line 15 3 Sep-08 Sep-10 Maharasthra
9 POWERGRID Supply and erection of the 400 KV Double Circuit Transmission Line from Chamera (Himachal Pradesh) to Jallandhar (Punjab) associated with Chamera-III Transmission System. 95 21 Oct-08 Apr-11 Himachal Pradesh
10 POWERGRID Supply and erection of 220 KV Trombay-Dharavi-Salsette Transmission line 120 27 Oct-08 Oct-10 Maharasthra
11 POWERGRID Replacement of disc insulator for NRTS-II, Package-A to D in J&K 15 3 Mar-09 Mar-11 Jammu & Kashmir
12 POWERGRID, 765 kV Single Circuit Sasan- Silwar (Ckt-II) Transmission Line 120 27 Nov-09 Mar-12 Madhya Pradesh
13 POWERGRID Supply and erection of tower Package A5 for Saharsa-Gopalganj section(Bihar) of 800 KV HVDC Biswanath Chariyali –Agra line associated with North East / Western interconnector 180 40 May-09 Feb-12 Bihar
14 POWERGRID, Supply & Services for 765KV S/C Sasaram-Fatehpur G1 Transmission Line associated with Sasan Ultra Mega Power Project 170 38 Mar-10 Jun-12 Uttar Pradesh
15 POWERGRID, Supply & Services for 765KV S/C Sasaram-Fatehpur G2 Transmission Line associated with Sasan Ultra Mega Power Project 170 38 Mar-10 Jun-12 Uttar Pradesh
16 POWERGRID Supply &Erection for 400 KV D/C Sasaram- Daltanganj T/L ,LILO of first 400 KV D/C Kahalgaon- Biharsharif line at Lakhisarai,LILO of second 400 KV D/C Kahalgaon- Biharsharif line at Banka & LILO of one circuit of 400 KV D/C Jamshedpur-Rourkela line at Chaibasa 160 36 March 11 Dec-12 Bihar, Jahrkhand
17 POWERGRID Supply & Erection contract for tower package-A1 for Kishenpur-New Wanpoh 400kV D/C transmission line 95 21 July-10 Dec-12 Jammu & Kashmir
18 POWERGRID Supply & Erection of tower package-A for Parbati-II-Koldam T/L 400 KV (Quad. Bundle) S/C-I along with D/C Portion associated with Parbati-II H.E.P.Transmission System 100 22 Aug-10 Dec-12 Himachal Pradesh
19 POWERGRID Supply & Erection of equipment& materials for Substation package –S5 for 400/220 kV Saharanpur New sub-station and Extension of Saharanpur & Roorkee Sub-stations 75 17 Nov-10 Aug-12 Uttar Pradesh
20 POWERGRID Supply & Erection of TL Tower Package for 765kV S/C Chamradol-Satna Part-II Transmission Line. 170 38 Dec-10 Sept-12 Madhya Pradesh
21 POWERGRID Supply & Erection for 765 kV S/C Vindhyachal Pooling-Chamradol part of Vindhyachal Pooling-Satna Ckt-II Transmission Line 110 24 March 11 Feb-13 Madhya Pradesh
22 POWERGRID, Supply and erection of 800KV HVDC Barabisa Islampur Transmission Line West Bengal 360 80 Jan-10 Jan-13 West Bengal
23 POWERGRID Supply & Erection for 765kv D/C Raigarh to Raipur TL and 400kv D/C Raigarh Transmission System for IPPS 150 33 Dec 10 Mar-13 Chhattisgarh
24 POWERGRID Supply & Erection for 765kV S/C Charkeri-Gwalior part of Satna Gwalior(Ckt-I), Transmission Line 230 51 Jan 11 Jun-13 Madhya Pradesh
25 POWERGRID Supply & Erection for 765 KV D/C, Jharsuguda to Dharamjaygarh Transmission Line & LILO of 765 KV S/C in Ranchi-WR pooling near Sipat. 160 36 Jan 11 Feb-13 Odisha
26 POWERGRID Supply & Erection for Kishenpur-New Wanpoh 400 KV D/C TL (Part II) and LILO of Kishenpur Wagoora 400 KV D/C Line 85 19 Feb 11 Aug-13 Jammu & Kashmir
27 POWERGRID Supply & Erection for 765 KV D/C Dharamjaygarh-Jabalpur Pool T/L (Part III) and 400 KV D/C Jabalpur Pool-Jabalpur Transmission Line 210 47 Feb11 Dec-12 Madhya Pradesh
28 PTCUL Supply & erection for construction of 400 KV DC Tapovan -Pipalkoti & Srinagar-Srinagar PH line & LILO of 400 KV DC Vishnuprayag -Muzaffarnagar Line at Pipalkoti 66.00 15 April 11 Apr-13 Uttarakhand
29 PTCUL Supply & Erection for 220 KV DC Latatapovan-Joshimath Transmission line 25.00 6 April 11 Apr-13 Uttarakhand
30 PTCUL Supply & Erection for 220 KV DC Joshimath- Pipalkoti Transmission line 61.00 14 April 11 Apr-13 Uttarakhand
31 POWERGRID Supply & Erection for 765KV D/C Champa pooling station – Raipur pooling station T/L (part –I) 125 28 July 11 Sep-13 Chhattisgarh
32 POWERGRID "Supply & erection contract for (i) LILO of 400 KV D/C ( QUAD) Simhapuri-Nellore T/L at Nellore pooling station. (ii) 765KV D/C Nellore pooling station – Kurnool T/L projects in Krishnapatnam area of Andhra Pradesh." 625 139 Dec'11 Aug-14 Andhra Pradesh
33 POWERGRID Supply & Erection contract for 400 KV D/C (QUAD) Dulhasti –Kishenpur Transmission line 150 33 Dec'11 Jun-14 Jammu & Kashmir