

OVERVIEW
Tata projects provides comprehensive solutions in the transportation sector. It is currently building several metro rail packages, highways, expressways and a dedicated freight corridor.
Tata Projects is proficient in designing and executing integrated packages which involve the construction of embankments, structures, tunnels, track works, overhead electrification, traction substations, signalling and telecommunication works. The company has executed over 1800 kms tracks for projects in this area and is currently executing approximately 2000 Track kms of railway lines in the Eastern and Western Dedicated Freight Corridors (EDFC and WDFC). It has deployed two Automated Track Laying Machines (being used for the in India).
The company has the distinction of building terminal building of Bamrauli airport in Prayagraj in record time of 11 months.

KEY AREAS

Roads
- Building highways and expressways using world class equipment.

Airports
- Accelerating India’s progress by building world-class airports on time.

Railways
- Executing large and complex rail projects, including the Dedicated Freight Corridor Project (eastern and western).

Mass Rapid Transit Systems
- Comprehensive design, engineering and construction solutions in Mass Rapid Transit Systems, Metro Rails, Mono Rails and other Urban Transport modes.

Inland Waterways & Ports
- Providing design and construction solutions for inland waterways and state-of-the-art ports.

KEY PROJECTS
Mumbai Metro Line 4 -2 packages: Elevated viaduct of 12.5 kms connect 14 stations
Delhi Metro Phase-III Contract CC-87 Elevated viaduct of 9 kms and 9 stations
Ahmedabad Metro Phase-I construction in E-W Corridor R2 including bridge over Sabarmati river and 7 stations
Mumbai Metro Line-III Package UGC 04: Underground twin tunnels of 6 kms and 3 stations
Lucknow Metro Phase-I Contract LKCC06: Underground twin tunnels of 3.68 kms and 3 stations
Mumbai Metro Line-III Package UGC 04: Underground twin tunnels of 6 kms and 3 stations
Highway in Udaipur
Ropeway in Dharamshala under difficult terrain
Terminal Building of Bamrauli Airport, Prayagraj.
Eastern & Western Dedicated Freight Corridor Design & Construction of Civil Structures & Track, 1592 TKm
240 TKm, OHE of Chhapra Gorakpur section for Core
355 TKm, OHE, S&T of Gooty section for RVNL
350 Tkm, OHE of Kondapuram Guntakal section for RVNL
EPC of Railway Infrastructure for 1050 MW Thermal Power Plant for GMR
122 kms Gauge conversion for Villupuram section including all civil works, bridge works, P.way works, OHE and S&T for RVNL
412 TKM of OHE, S&T of Raninagar Jalpaigufi-New Bongaigaon section for RVNL
375 TKM of OHE between Nallapadu-Pagidipalli section for CORE
Pune Metro Rail Line 3: Elevated viaduct of 23.3 kms
Global PresenCe