Mumbai Trans Harbour Link is a landmark six-lane road bridge across the Mumbai Bay between South Mumbai and Navi Mumbai. This link, with a length of ~ 22 kms, once completed will be the longest sea bridge in India.
Tata Projects is executing Package-2 of the link, in a joint venture with Daewoo E&C. The project involves the utilisation of 32 orthotropic steel decks with span length of upto 180 meters with weight of upto 900 tonnes. Such structures have been used for the first time in India. The project is scheduled to be completed in Q3 FY2024